Kennedys were called into remove an ACM containing mastic from the drive way and rear holding yard approximately 1500 L/Meters of material which need to be removed by hand. Then cleaned and resealed the expansion joint with a sealing mastic. The whole process was done in very professional manner with exclusion zones set out air monitoring, waste disposal all done. Very punctual and courteous team.